Cabled mainline stoppage through water closet flange by pulling toilet with general speed rooter 91 7/8" cable machine to clear. Video inspection discovered 4" drain line holding water approx. 60' from flange in downstairs bathroom. Will return on 2/19/07 to locate line with Ridged Navitrak line location system. Install shower valve and riser for shower. Connect special fittings from guest pipe and 1/2" to CPVC 1/2".Mand shower valve complete with trip and handles. Wall needs to be repaired to permanently mount shower head. Stoppage in kitchen of Unit B-18.

Located cleanout beneath building in crawl space. Cabled mainline with General speedrooter 91 cable machine. Could not clear. Notified and received authorization to hydro jet building Main line stoppage-Units 104-102-101. Flooding grand around outside cleanout. Needing pump truck and hydro jetter on site. Sucked up contaminated sewer water and waste with pump truck around outside cleanout. Hydro jetted main sewer over 100' until stoppage was cleared and apartments could use drain again cleaned up contaminated waste left over after stoppage was cleared. Replace tee air chamber. 90 stop water leak was already exposed. Labor Pro-press Fittings 1 1/2 T coupler, air breaker. Replace 3 diverter stems.

Cabled mainline through outside cleanout with general speed rooter 91 7/8" cable machine to clear stoppage. Video inspection found root intrusion approx. 38' from cleanout. Cabled through roof vent and cleared stoppage. Needs to be lowered outside to street. Possible will need jetting for grease build up. Ran cable through roof vent and cleared stoppage. Ran camera and needs jetting, will back up soon Cable main line via cleanout. Clear blockage @ 20 feet. Camera inspected line and found 10feet belly in line and excessive grease. Closet auger hall bath toilet. Pulled back wipes. Broken toilet. Replace standard toilet with American Standard comfort height. Solar panel are leaking. Take down all solar panels plus plumbing cap off. 120 gallons hot water tank 240 electric. Remove all solar power on roof cap off at ground. Replaced upper element sensor as well panel. Leak detection. Exposure/digging to expose. Remove bad leaking section of copper water line and repair with new fittings. Turn water on at meter and check for leak. Back fill dirt.

Excavate existing cleanout and eliminate. Replaced with SCH 40 PVC to continue flow location not properly located. Hand dug roughly 20' to locate pipe. Cut section of pipe and installed 4" cleanout. Extension left long. Need to get contractor to cut to correct height and give cap. High pressure drain cleaning restoration. Jet main line using 4000 PSI Building 1402 completely stopped. Main line , bath tubs and toilets filled with sewage water. Requires high pressure hydro jetting to clear from roof vent (main line and branch) High pressure washer jetting through roof vent to clear stoppage and clean lines Upon clearing stoppages, video inspection discovered bellied line approx 15' going back under building from cleanout. Requires removal of bad section for long term solution. Replace customer supplied kitchen faucet with new supply lines. Replace p-trap in men's room lav sink. Replace entire assembly for T and S valve for 3 compartment sink in back of kitchen. Replace both hot and cold barrel seat, stem, handle and gaskets. replace seats and washer for T and S hand sink on left side of kitchen facing the kitchen. Replace fill valve handles flapper for 2nd toilet in women's restroom. Replaced 30 gal. electric water heater in master bathroom closet. Tee off 3/4" water main and run 1/2" CPVC down wall and into patio area with new hose bib. Strap pipe to wall. High pressure drain cleaning restoration. Jetted main sewer line from cleanout to tank and cleanout to house.

Pulled toilet in downstairs bath. Replaced wax ring. Reset toilet and grouted in. Replaced 2 flappers in upstairs bath. Disconnected p-trap and ran pistol machine thru drainage. Cleared blockage. Reattached p-trap. drains fine and no leaks. Laundry valve is broken off in wall. Access wall to replace copper line and laundry bibb. Cleared toilet stoppage with closet auger through trap. Replace 2' section of 3" PVC. Install cleanout and riser. Cut out roots over sewer line. Ran K-60 cable thru floordrain by dishwasher. Blockage was at bottom of trap. Tested ok. Ran K-60 cable thru floordrain by dishwasher. Blockage was at bottom of trap. Tested ok.

Leak under bath tub. Cut access behind and tub and found deteriorated overflow and drain assembly. Replaced with new plastic tubular assembly. Cabled tub drain and removed hair stoppage. Company repaired main water supply to backflow preventer for irrigation system pumped out cut down pipe and replaced unit. Replaced existing toilet with new ADA handicap Kholer power flush toilet. Replaced existing seat with front commercial toilet seat. Supply line is poor condition replaced with new braided steel line. Replaced toilet flange on same toilet existing flange was cracked and allowing toilet to rock back forth. All work performed in men's room in bathroom at rear of store in handicap stall.

Replace steel fittings with galv. 1 tech labor 4.5 hrs Replaced 1 2" T 2 1" 90 2 1"X1 11/4 Reducer 3" galv. No water to dishwasher. Put in new stainless steel braided hose and 90 degree connector to dishwasher. Removed and replaced dishwasher. Turned main waterline off to house to reposition 2 way hot angle stop. Located main drain line 2 location from interceptor back and from interceptor to man hole. Tree on top of sewer. Removing tree from sewer. Also a sewer repair. No responsible for landscaping or tracks in yard from machine. Replaced tank to bowl gasket and tank bolts washers in upper level master bath. Septic cleanout. Drainfield is failing. Installed customer supplied toilet. Removed old toilet and discarded unit. Cabled bath tub through overflow. Septic tank cleanout. Jetting of main line. Removed grease. Drainfield hydraulically overloaded. Leak under sink. 2 compression fitting on 1/4 line from supply to filter as well as out to refrigerator. Cable sink line through cleanout. Televise line.

Cabled through vent stack and hit very hard obstruction. Cable eventually went through and cable to main. Heavy amounts of roots came back on cable. Unable to see clearly. Suspect large root blocking the camera and line is still holding water. Replaced fill valve in toilet and flapper adjustment to fill valve and water lever. Replace 3" gate valve flanged with new gasket and bolt kits. Replace 2" gate valve for water softener. Bypass assembly with new 2" ball valves and propress fittings. Installed new kitchen faucet with sprayer. Installed two brass shut off valves with stainless supply lines Company rebuilt inside moen bold style shower bodies homes body and replacing cartridge to avoid breaking wall. Also replace 2 lavatory faucets with pop up assembles and replaced k/s faucet all as agreed. Had to abandoned reverse osmosis filter system connection and replace pipes where all connection were made due to leaks after all repairs done.

Water main broken under ground outside of building 42-43. 3/4 water server to building 43 broke 4.10 underground Between building and side walk. 3/4 copper pipe 1.6' two pro-press couplers. Made repair and back filled. Left mounded up for jetting. Shut water of at south side of complex. Turned water on. Pulled permit, tested and certified 1" RPZ. Backflow device for domestic service. Water device was improperly installed without permit by others. reinstalled up to code. Leak outside on reclaim water. Dug outside section from meter to sidewalk, repaired galvanized line with 1" PVC.

MLS. Recommend a sewer repair. Ran 7/8 cable through c/o and clear stoppage. Ran camera and saw roots in line. Kitchen stoppage. Pulled G.D. and auger 20' to clear, pulled hair. Also unjamed garbage disposal. Added flange extension. Camera inspected line. Condition is fair. Clear blockage in employee's toilet, pulled paper towel. Also replaced sloan diaphragm 1.5 to 3.5 GPM also caulked 4 lav sinks in men's and women's bathroom. Tighten all toilet seats. Replace toilet seat in employer's toilet as requested. Installed new commercial toilet (handicap). Install new urinal. Install new wall mount sink and handicap faucet. Cleared stoppage about 20' out from toilet. Pulled toilet to access main line. Video inspection revealed extremely heavy scale buildup and back pitched in pipe from 20' out to 28'. Pump 1500 gallon septic tank.

Pump 500 gallon liftstation. Locate sewer line Location of sewer line inside and outside with camera and location. Repaired water heater element in 50 gal. electric water heater. Replace water heater in upstairs in about 30days from this date. Septic Pump out. Bio-Choice Treatment. High pressure drain cleaning restoration. jet out main line from house to tank. Septic pump out. pump 1500 gallons septic tank. Pump 500 gallons lift station. Auger from vent and pulled nothing back. Tested OK.

Recommend install cleanout. Replace master bath toilet. KS stoppage. Cleared stoppage with cable machine. Cut out old PEX fittings in manifold . replace with CPVC two tees connect with shark bite fittings on cold side of wall manifold. Installed customer supplied granite double kitchen sinks, disposer and faucets. Replaced outside hose bib in pool area. Note need to breakout concrete to gain access and reroute. Cost to excavate and repair 3/4 PVC water line and plug house side of water meter. Cost includes materials and labor, back fill to rough grade. High pressure drain cleaning restoration. Jet out main sewer line from tank to house and cleared stoppage. Camera line underneath house and found break 12 to 15 feet from inlet of tank. 1" copper main is broken in wall. Install customer supplied water heater. Cut out old 1" copper pipe to expose from wall and section of 3/4" copper pipe from a 1x3/4x3/4 tee CPVC with shark bites and installed new ball valve 3/4 to main cold water supply by water heater. Installed customer supplied water heater with customer supplied fitting kit. Reconnected electric and tested for heat content. Tested OK.

Replaced 4 bar sink straining basket and al new plumbing into drain with all PVC SCH 40 pipe. Leaking fitting on irrigation line in garden center. Removed faulty fitting on irrigation line. Plugged off line with threaded plug. Operates fine. No leaks. Toilet stoppage. Cleared stoppage with hand auger. Company trouble shot commercial 3 phase 100 gallons water heater and found that stat and fuse were burned out and were overworking single element, while others are not getting current. Also repaired dishwasher. Station Chicago sprayer. High pressure drain cleaning restoration near rotisserie station in the rear of the store. Replaced two shut off and lav sinks. Replace shut off and riser on upstairs toilet. Installed new 40 gallons electric heater and hauled away old one.

Leak actually coming from toilet flange and wax ring for room 505. Pulled toilet repaired flange, and installed new wax ring for toilet. Reset toilet and caulked around base. Cleared main line stoppage 35 feet. Main line stoppage. Main line stoppage through vent on roof. Scrubbed main line to clear drains and found that drain near rotisserie and cooler had to be cleared. Due to discharge and grease. Company jetted lines and removed plugs from inside and scrubbed lines near station and display coolers. Water is leaking in bathroom. leak is under the tub waste and overflow. Also shower pan is leaking. Septic pump out. Jetted main line. Auger toilet to clear. Toilet is not filling properly. Recommend rebuild. Replaced customer supplied lav faucet. Tested OK. Auger from roof vent with 5/8" cable. Tested OK. Complete home inspection report, repair list. Hall Delta tub and shower valve leaking at handle. Rebuilt faucet with seats and springs and gasket. Kitchen faucet tighten packing nut and handle to stop the leak. Water heater had improper supply line and mproperly installed temp and pressure relief valve. Replaced with CPVC, added cold side shut off valve, piped T and P valve to the floor, per FLA plumbing code. Auger from vent @ pool bath, pulled back paper towels. Also camera inspected building drain and found cast iron.

Toilet in hall bath has bad siphon. Recommend replace with Kohler Welworth. Cannot warranty until cleanout is installed and jetting is complete. Auger from p-trap, 16' to clear. Bio-Choice Treatment. Two bottles of Bio and hydro jett main line from house to tank to cleanout line. High pressure drain cleaning restoration. Jetted floor drains to grease trap to clear grease stoppage with Harban drain cleaning technology. Price includes additional tech and equipment fee to clear. Heavy grease buildup was removed. Repair broken section of 4" cast iron pipe with 4" PVC. Break caused line to become back pitched. Excavated 3 1/2" deep roughly 6'. Installed new pipe back filled. Broke small section of sidewalk to access fillings to correct pitch. Repaired leaking MIP filling with new MIP on 1" water main to building.

Hot water inop. Moen Cartridge. Valve has integral stops. Removed old cartridge. Installed new Moen 1222 psi temp cartridge. Replaced trim. Operates normally. No hot water in guest bath shower. Adjusted temp control on Moen cartridge shower valve. Operates fine. Multiple plumbing problems. Installed fill valves. Caulked 1 whirlpool bathtub. 1 bath tub. 1 toilet and reset and tightened. Cleared tub stoppage. kitchen sink drain. clear garbage disposer and reset. Main copper lie leaking. Repair broken copper line and put CPVC 3/4" shut of valve to house back filled. Video inspected line outside by 2nd cleanout before grease trap found steel in drain. Could not remove due to pipe separation.

Laundry line is backed up. Cleared blockage through roof vent. request to install kitchen sink. Installed customer furnished sink, faucet and gd. kitchen sink stoppage. Need jetting of kitchen on vent stack, Cabled from roof vent and cleared sink line. Frog in pipe video inspected will need jetting soon. Pump out truck. Jetting all drain lines under building. Rebuild 2 toilets with parts and replace 2 flappers and re-grout toilets. Labor for 6 hours and camera line and located. Replaced faucet in slop sink. Rebuilt faucet and seats hand sink, Rebuilt faucet, washer and seats prep sink in back wall of kitchen. Installed vacuum breaker on soup dispenser for dish and hose bibb at dumpster The whole complex is backed up. 2 hours with jetter and 1 additional hour of labor on jetter for 1st tech. 5 hours of labor for second tech on 1 on jetter, totaling 6 hours for 2nd tech. Pump out man hole in parking lot, on the right when entering complex. 2 loads pumped out with disposal fee. Jetting removed much buildup of grease in main line.

Back up may have resulted from the fact that the lift station pumps are not operating at optimal level. The secondary pump may have blockage. Recommend that both pumps be replaced due to the extremely slow speed at which the lift station emptied. Drain line is leaking. Repair drain line and replace washer. Set-up Fee: (LRG) Assessment of damages and placement of equipment for dry-out. Extraction of Hazardous Waste (sq/ft) Six LGR Evolution Dehumidifiers @$98.00 each per day of usage 13 Santana SX Turbo Dryers @$35.00 each per day of usage. One LGR Evolution Dehumidifier @$98.00 each per day of usage. Two Santana SX Turbo Dryers @$35.00 each per day of usage. Negative Air/Airscrubber (LRG) 2600 Unsmoke Fogger: (XLRG) Cold fog antimicrobial/deodorizer through all affected areas of home. Removal of Contaminated Carpet (sq/ft)

Cabled mainline stoppage through outside cleanout with general speed rooter 91 7/8" cable machine to clear stoppage. Video inspection of mainline found sand in lines approx. 15' from cleanout building up to before city tap. Line looks to be in good condition. Requires high pressure drain cleaning with Harban drain cleaning technology high pressure hyrdo jetting equipment. Drain Doctors Inc. will provide labor, equipment and material to perform the following tasks: -Install tank where existing storm drain enters ravine. -Run electrical from the closest house panel on building through asphalt to tank and backfill to ruff grade. -Install 230 volt pump and float inside tank capable of pumping 200 gpm. -Lay approximately 300' of 2" SCH 40 PVC to the need of the ravine. -Re-slope area starting from furthest point from the newly installed basin and re-shape the depth of the ravine so along the most southern side will be flat. -Lay sod on slopes. -Hay and seed flat surfaces.

Drain Doctors, Inc. agrees to furnish labor and materials necessary to install gutter drains in the locations specified below. All work will be performed with the highest level of quality and workmanship. Install 18 gutter drains 4' in length and 6" in width in the landscaping beds in front of the following buildings: Building 7 unit 10857 will need one in the front and one on the side. Building 8 unit 10845 will need one in the front and one on the side. Building 8 unit 10851/10847 will need one in the front for each. Building 9 unit 10833 will need one in the front. Building 9 unit 10843 will need one in the front. Building 10 will need one in the front. Building 13 unit 10751/10747 will need two in the front. Building 13 unit 10741 will need one in the front. Building 13 unit 10759 will need one in the front. Building 15 unit 10716 will need two in the front. Building 19 unit 10746 will need one in the front. Building 21 unit 10766 will need one in the front. Building 34 unit 1044 will need one in the front. The first jetting maintenance is included in this quote one year after installation this will insure maximum life of the drainage system. Drain Doctors agrees to furnish labor and materials necessary to install yard drains in the locations specified below. All work will be performed with the highest level of quality and workmanship. Install one Wet Well and Sump Pump with two drains, one yard drain and one concrete gutter drain at Building 9 unit 8136: Saw cut concrete sidewalk in courtyard area to privacy wall. Core drill through privacy wall foundation. Saw cut along back wall of building next to meter room. Install one gutter drain 4' in length and 4" in width, running drain in to wet well. Install one 1' square yard drain box in the landscaping area in court yard, running drain into Wet Well. Wet well and Grinder Pump will be installed outside of courtyard in the front lawn area next to privacy wall. Discharge outlet will be run into parking lot Island curb. Saw cut curb and sidewalk to run drain pipe through. Install one junction box on the outside of meter room with all electrical wires in conduit for the Grinder Pump. All saw cut sections of sidewalk and curb will be replaced at the same time work is in progress. Replace Grease Interceptor with new Endure Grease interceptor in its current location. With a 50 GPM flow rate and a liquid capacity of 52 gallons. The current grease trap has a 2 inch inlet with 4 inch drain pipe tying into the 2 inch inlet. This is causing the store to backup at least once a month. The new grease interceptor will eliminate this problem and should have been installed the first time. Also, do to this problem major grease build up has occurred in the drain pipes and will need to be jetted at time of installation.